Recent Projects

image

Toyota Australia HV Site Power Transformation

A total, Turn Key package solution.

  • HV cables removal and installation including civil works, conduit installation and remedial works
  • HV Substation decommissioning
  • Installation of new RMU including civil works
  • HV/LV Solar system relocation
  • Optic Fibre network
  • SCADA upgrade.
image

Sunbury Water Treatment Upgrade

Upgrade of Electrical power and controls on operational Water Treatment Plant.

  • Upgrade of HV power to site
  • Schedule power outages to minimalise disruptions
  • Supply and installation of backup Generators
  • Manufacture of MSB and control panels
  • Design Verification.
image

Sugar Australia C2Y - Hazardous Area Relocation

Relocation of castor sugar packaging plant from Croydon to Yarraville.

  • Electrical Design Programming and SCADA
  • Set up of new facility including new 2 MVA HV kiosk sub-station
  • New Form 4 MSB
  • Decommissioning of Croydon plant
  • Installation and commissioning of plant at Yarraville.